TY - JOUR
T1 - Análisis técnico y económico del proyecto" cambio de redes abiertas a preensambladas" aplicado a una empresa de distribución de energía eléctrica.
AU - Laverde Albarracin, Cristian Samuel
AU - Carrillo Escobar, Patricio
AU - Herrera Albarracín, Roberto Carlos
AU - Guaman Sanchez, Cristian Fernando
PY - 2020/1/1
Y1 - 2020/1/1
N2 - In Ecuador there are electricity distribution companies that have losses due to theft in the most
vulnerable areas of the country, which generates a great problem for companies to counteract
these practices; for this reason, Electricity and Renewable Energy Management (MEER) since
2009, implemented a Losses Reduction Plan (PLANREP), which main objective was to neutralize
this problem. One of the PLANREP projects implemented in CNEL Santo Domingo Business Unit
( where this study was applied), it was the change from open to pre-assembled networks, so the
objective of this project was to determine the technical and economic efficiency of the project
that resulted in the total recovery of non-technical energy losses of the secondary circuits under
study; in addition to the economic analysis was determined the rapid recovery of the investment
being a profitable project for the distributor.
AB - In Ecuador there are electricity distribution companies that have losses due to theft in the most
vulnerable areas of the country, which generates a great problem for companies to counteract
these practices; for this reason, Electricity and Renewable Energy Management (MEER) since
2009, implemented a Losses Reduction Plan (PLANREP), which main objective was to neutralize
this problem. One of the PLANREP projects implemented in CNEL Santo Domingo Business Unit
( where this study was applied), it was the change from open to pre-assembled networks, so the
objective of this project was to determine the technical and economic efficiency of the project
that resulted in the total recovery of non-technical energy losses of the secondary circuits under
study; in addition to the economic analysis was determined the rapid recovery of the investment
being a profitable project for the distributor.
KW - PlanRep; Cnel EP; Van; Tir; Eficiencia Energética
KW - PlanRep; Cnel EP; Van; Tir; Eficiencia Energética
UR - https://revistasdigitales.upec.edu.ec/index.php/sathiri/article/view/943
M3 - Artículo
SN - 2631-2905
JO - SATHIRI: Sembrador
JF - SATHIRI: Sembrador
ER -