Skip to main navigation Skip to search Skip to main content

Transmission expansion planning by using DC and AC models and particle swarm optimization

Research output: Chapter in Book/Report/Conference proceedingChapterpeer-review

2 Scopus citations

Abstract

The Transmission Expansion Planning (TEP) entails to determine all the changes needed in the electric transmission system infrastructure in order to allow the balance between the projected demand and the power supply, at minimum investment and operational costs. In some type of TEP studies, the DC model is used for the medium and long term time frame, while the AC model is used for the short term. This chapter proposes a load shedding based TEP formulation using the DC and AC model, and four Particle Swarm Optimization (PSO) based algorithms applied to the TEP problem: Global PSO, Local PSO, Evolutionary PSO, and Adaptive PSO. Comparisons among these PSO variants in terms of robustness, quality of the solution, and number of function evaluations are carried out. Tests, detailed analysis, guidelines, and particularities are shown in order to apply the PSO techniques for realistic systems.

Original languageEnglish
Title of host publicationSwarm Intelligence for Electric and Electronic Engineering
PublisherIGI Global
Pages260-284
Number of pages25
ISBN (Print)9781466626669
DOIs
StatePublished - 2012
Externally publishedYes

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Fingerprint

Dive into the research topics of 'Transmission expansion planning by using DC and AC models and particle swarm optimization'. Together they form a unique fingerprint.

Cite this