Projects per year
Projects
- 1 Finished
Search results
-
Finished
Use of the alternating current model for Integrated Multi-Capa Planning of the Expansion of Transmission/Subtransmission Lines and Reactive Power Sources in Electric Energy Systems
Torres Contreras, S. P. (Director), Astudillo Salinas, D. F. (Co-Director), Lopez Quizhpi, J. C. (Guest Researcher), Ordoñez Giron, J. F. (Research Associate), Matute Alvarado, N. E. (Assimilated Technical Staff) & Morquecho Salto, E. G. (Assimilated Technical Staff)
9/09/19 → 8/09/21
Project: Research