Project Details
Description
The final step in the cement manufacturing process consists in the transformation of the clinker into cement flood. A rotary mill with steel balls is used for this purpose. FEED WITH POCOMATERIAL The mill produces inefficient use of balls, friction between them and unnecessary energy wear. An excessive load could produce clogging. The correct operation and control of this stage allows to generate efficiency in the cement plnata, minimizing the consumption of electricity and delivering a final product within quality specifications. This project proposes the development of a centralized supervisory control strategy, to attend the operation of the cement mill. The control strategy is developed on an industrial computer installed in the plant and is connected to the industrial network of the system. Supervisor control sends slogan points calculated in real time to distributed control systems installed in the process.
Call for Applications
OUT OF CALL – INTERNAL FUNDS
| Short title | Development Supervisory Control Strategy Circuit |
|---|---|
| Status | Finished |
| Effective start/end date | 1/09/15 → 30/09/16 |
Keywords
- Cement
- Circuit
- Windmill
- Development
- Strategy acontrol
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.